Капитальный ремонт магистрального газопровода «Ставрополь-Грозный» на участке 122-173 км.
Country: RussiaCustomer: Gazprom transgaz Stavropol, LLC
Length:7 km.
Diameter:Ø720 mm.
Pressure:max. 5.4 MPa
Work period:2007
Client:Gazprom transgaz Stavropol, LLC
Stavropol – Grozny main gas pipeline overhaul project provided for detailed diagnostics to look into pipe body condition to find whether or not it can be reused.
The pipes that were rejected upon inspection of the results were replaced with new ones; the old anti-corrosion coating was replaced for new Transkor-Gas coating along the entire length of the pipeline section.