Country:  Russia
Customer:  Gazprom Transgaz Stavropol, LLC
Infrastructure components built: Dn 1200 pig launcher, gas pressure reduction terminal, 9 block valve stations, thrust-bored motorway crossing. Diameter: Ø1220 mm.
Pressure: max. 5.4 MPa
Work period: 2014
Client: Gazprom transgaz Stavropol, LLC

The pipeline was built in the constrained conditions of the existing Stavropol – Grozny main gas pipeline corridor, with very many pipelines and utilities to cross. The progress was complicated by rocky soils, which called for the use of special ripping equipment, and stretches of watered ground. SPK-Magistral completed a series of dewatering measures to lower the water table.